Reservoir Evaluation and Development ›› 2020, Vol. 10 ›› Issue (4): 32-38.doi: 10.13809/j.cnki.cn32-1825/te.2020.04.005

• Methodological and Theory • Previous Articles     Next Articles

Analysis of low-efficiency wells in CBM gas field of South Yanchuan and optimization of measures

LI Xin(),XIAO Cui,CHEN Zhenlong,JIN Xiaobo   

  1. Research Institute of Exploration and Development, Sinopec East China Oil and Gas Company, Nanjing, Jiangsu 210031, China
  • Received:2020-02-25 Online:2020-08-26 Published:2020-08-07

Abstract:

The low-yield and low-efficiency wells in the deep coal seam gas field of South Yanchuan are of high proportion and the reasons for low-yield are complex, so that it is difficult to achieve the expected development effect. In order to solve these problems, taking the low-yield and low-efficiency wells in South Yanchuan CBM Gas Field as the research object, the integrated research and analysis of geological engineering have been carried out. Combined with the practical experience of CBM development, it is found that the unreasonable drainage rate leads to the blockage of coal reservoir seepage channels, the inadequate reservoir transformation results in a small discharge area, and the lack of formation energy in the low-pressure area leads to the limitation of coal bed methane desorption. These three problems are the main reasons for the production of low-efficiency wells in South Yanchuan. For the reasons of inefficiency, production stimulation measures such as controllable strong pulse deblocking, volume fracturing to achieve fracture steering, nitrogen disturbance dredging and desorption have been carried out. The results of field application evaluation show that these measures can achieve different degrees of production increase, among which volume fracturing can achieve the purpose of effectively improving the physical properties of the reservoir. The daily production of a single well is increased by 1 000~4 000 m 3. The effect of production increase is remarkable. It is the most effective means of increasing production in South Yanchuan CBM Field currently.

Key words: South Yanchuan, CBM(coalbed methane), low-yield and low-efficiency, stimulation measure, volume fracture

CLC Number: 

  • TE37