Reservoir Evaluation and Development ›› 2019, Vol. 9 ›› Issue (2): 60-64.

• Petroleum Engineering • Previous Articles     Next Articles

Study on combined system of profile control and acidification of injection wells in BZ oilfield

Liu PingLi1,Zhang Fengchao1,Gao Shang2,Tao Weidong3,Ran Jinxi1,Huang Fushan1   

  1. 1. State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Southwest Petroleum University, Chengdu, Sichuan 610500, China
    2. Bohai Petroleum Research Institute, Tianjin Branch of CNOOC(China) CO., LTD., Tianjin 300000, China
    3. No.4 Oil Production Plant of Dagang Oilfield Company,CNPC Tianjin 300000, China
  • Received:2018-06-15 Online:2019-05-07 Published:2019-04-26

Abstract:

Due to the heterogeneity of the formation of injection wells in BZ oilfield, the single acidification and profile adjustment were impossible to increase the injection and decrease the interlayer contradiction simultaneously. So we studied the combined acidification and profile control system indoors. The supporting acid solution system was one-step acid solution system, and its performance such as retarding speed, inhibiting secondary precipitation, dissolution and compatibility were evaluated experimentally. And then, we obtained that the permeability recovery was good after single core acidizing. The main agent of profile control agent system is anionic polymer, and its acid resistance and core plugging ability were evaluated. A double-core clamping flow test device was used to simulate the non-homogeneous layerss and analyze the influence of the injection sequence of the profile control and acidizing on the combined treatment effect. The simulation results showed that the acidification effect after profile adjustment was obvious, the permeability improvement ratio of low permeability core was 1.52, the permeability improvement ratio of high permeability core was blocked, and the permeability improvement ratio was 0.29. The goal of starting low permeability core by reducing the permeability difference between layers was realized.

Key words: injection well, heterogeneous, profile control, acidification, plugging, combination process

CLC Number: 

  • TE357