Petroleum Reservoir Evaluation and Development ›› 2021, Vol. 11 ›› Issue (5): 736-743.doi: 10.13809/j.cnki.cn32-1825/te.2021.05.011

• Offshore Oil andGas Exploration and Development • Previous Articles     Next Articles

Selection of fracturing wells and layers of Bohai J Oil Field in the late stage of high water cut and its application

YAN Jianli(),YAN Guanshan,GU Zhimeng,BIE Mengjun,ZHANG Zhenjie   

  1. Bohai Oilfield Research Institute, Tianjin Branch of CNOOC Limited, Tianjin 300459, China
  • Received:2021-05-13 Online:2021-10-26 Published:2021-10-12

Abstract:

After the long-term water and polymer flooding, the remaining oil distribution in the late stage of high water cut is complex, and it is difficult to select fracturing wells and layers. In order to solve these problems, an improved calculation method of the dimensionless liquid production index for wells in polymer flooding oilfields is proposed to evaluate the production capability and changes, then the wells that the dimensionless liquid production index dropped more than 30 % are selected. At the same time, combined with the fine geology and reservoir analysis, the quantitative characterization of displacement multiple in the late stage of high water cut is studied and the remaining oil for each layer is evaluated. At last, the method of selecting fracturing well and layer in Bohai J Oil Field is established. Field applications showed that this method was reasonable and effective, the oil production incremental for each well after fracturing is about 14 to 42 tons. It can also provide reference for the selection of fracturing measures and the evaluation of well stimulation potential of similar oilfields in the late stage of high water cut.

Key words: fracturing, late stage of high water cut, well and layer selection, polymer flooding, Bohai

CLC Number: 

  • TE345